The Constitution River Rehabilitation Project

  • 0 Comments
  • 14 October 2016
river-project1

A massive project was undertaken to transform the river from a stagnant pool of water collecting garbage and breeding mosquitoes into a space that would improve the look of Bridgetown and offer locals and visitors a place to stroll along the waterside.
before-after1

 

The project required a landscape contractor with the knowledge and experience to deliver a high quality installation, in challenging conditions, with a limited budget, and in a tight deadline. These palms were prepared in advance so they could be transplanted at a large size and transform the landscape overnight. The project required a landscape contractor with the knowledge and experience to deliver a high quality installation, in challenging conditions, with a limited budget, and in a tight deadline.

before-after1

The landscape needed to be low maintenance, so we grew thousands of native species that would be able to survive with minimal costs after they mature. In this photo you can see carpet daisy and khus khus grass. This beautiful space, installed and maintained by Nature Care will be a source of enjoyment for generations to come.

before-after3

Leave a Comment